PSC has a long history of serving the Nuclear Industry’s needs for In-Service Inspection of post-tensioned systems. PSC has been involved with just about every post-tensioned containment building in the country, and most for quite some time. The tables below summarize the vast experience PSC has, and the services that have been provided to each plant. Click on the links below to be taken to a specific plant’s history with PSC.
Replacement of 22 horizontal and 6 vertical tendons with detensioning of additional 6 horizontal and 18 vertical tendons. Reinstalling and stressing tendons for replacement of steam generator through wall of containment. Subcontract Bechtel Power Corp.
2005
1
Replacement of 22 horizontal and 6 vertical tendons with detensioning of additional 6 horizontal and 18 vertical tendons. Reinstalling and stressing tendons for replacement of steam generator through wall of containment. Subcontract to SGT Corp.
Braidwood Nuclear Station
Braidwood, IL
Commonwealth Edison Co.
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1987
*
*
*
*
*
*
1988
*
*
*
*
*
*
1990
*
*
*
*
*
*
1992
*
*
*
*
*
*
1996
*
*
*
*
*
*
1997
*
*
*
*
*
*
1998
*
*
*
*
*
*
1999
*
*
*
*
*
*
2000
*
*
*
*
*
*
2001
*
*
*
*
*
*
2006
*
*
*
*
*
*
Tendon Removal & Replacement
Year
Unit
Description
1998
1
Detensioning of 38 vertical and 32 horizontal tendons, reinstalling and stressing tendons for replacement of steam generator through wall of containment. Subcontract to Bechtel Power Corp.
Brunswick
Southport, NC
Carolina Power & Light
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1986
Recommendation to Specification & Complete Surveillance Program & Manual
1994
*
*
*
*
*
*
2000
*
*
*
*
*
*
2006
*
*
*
*
*
*
Byron Nuclear Station
Byron, IL
Commonwealth Edison Co.
Year
Unit
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
1986
1
*
*
*
*
*
1987
1 & 2
Additional Visual In-Service & Inspection for Selected Tendons
1988
2
*
*
*
*
*
1990
1 & 2
*
*
*
*
*
1993
*
*
*
*
*
1999
1 & 2
*
*
*
*
*
2004
1 & 2
*
*
*
*
*
Tendon Removal & Replacement
Year
Unit
Description
1997
1
Detensioning of 38 vertical and 32 horizontal tendons, reinstalling and stressing tendons for replacement of steam generator through wall of containment. Subcontract to Bechtel Power Corp.
Callaway
Fulton, MO
Union Electric
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1988
Supply Post-Tensioning Parts under Quality Assurance Program
1989
*
*
*
*
*
*
1994
*
*
*
*
*
*
1999
*
*
*
*
*
*
2004
*
*
*
*
*
*
Calvert Cliffs
Lusby, MD
Baltimore Gas & Electric Co.
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1991
*
*
*
1996
*
*
*
2002
*
*
*
Crystal River
Crystal River, FL
Florida Power & Light
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1997
*
*
*
*
1998
*
*
System maintenance and topping off grease cans.
2001
*
*
*
*
Darlington
Newcastle Township- Ontario, Canada
Ontario Hydro
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1992
*
*
*
*
*
*
1997
*
*
*
*
*
*
Farley Nuclear Station
Dothan, AL
Alabama Power Co.
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1997
Develop Specifications, Manual Testing Program & Supply Anchorages
1998
Supply grease can for post tensioning under Quality Control Program
2001
*
*
*
*
*
*
Fort Calhoun Nuclear Station
Fort Calhoun, NE
Omaha Public Power District
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1986
*
*
*
*
*
*
1991
*
*
*
*
*
*
1996
*
*
*
*
*
*
2001
*
*
*
*
*
*
2006
*
*
*
*
*
*
Tendon Removal & Replacement
Year
Unit
Description
2006
1
Replacement of 68 helical tendons with detensioning of additional 40 helicals tendons. Reinstalling and stressing tendons for replacement of steam generator through wall of containment. Subcontract to Bechtel Power Corp.
Ginna
Ontario, NY
Rochester Gas & Electric Corp.
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1995
*
*
*
*
*
*
2000
*
*
*
*
*
*
2005
*
*
*
*
*
*
Lasalle County Station
Commonwealth Edison Co.
Year
Unit
QA Control Inspector
Calibration
Field Tech Asst.
Equipment
Other
1996
1 & 2
*
*
1988
*
*
1992
1
*
*
*
*
1997
1 & 2
*
*
*
*
1999
2
*
*
*
*
2003
1 & 2
*
*
*
*
2004
1 & 2
*
*
*
*
Millstone Nuclear Power Plant
Waterford, CT
Northeast Utilities
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1992
*
*
*
*
*
*
1996
*
*
*
*
*
*
2001
*
*
*
*
*
*
2006
*
*
*
*
*
*
Oconee Power Plant
Senneca, SC
Duke Power Co
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1996
*
*
*
*
*
*
2000
*
*
*
*
*
*
Tendon Removal & Replacement
Year
Unit
Description
2003
1
Replacement of 60 horizontal and vertical tendons for replacement of steam generator through wall of containment. Subcontract to SGT Corp.
2006
2 & 3
Replacement of 120 horizontal and vertical tendons for replacement of steam generator through wall of containment. Subcontract to SGT Corp.
Palisades Nuclear Power Plant
Covert, MI
Consumers Power Co
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1987
*
*
*
*
*
*
1992
*
*
*
*
*
*
1997
*
*
*
*
*
*
2002
*
*
*
*
*
*
Tendon Removal & Replacement
Year
Unit
Description
1990
1
Detensioning of 120 tendons, removal of 50 tendons, reinstalling and stressing tendons for replacement of steam generator through wall of containment.
Point Beach
Two Rivers, WI
Wisconsin Electric
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1999
*
*
*
*
*
*
2003
*
*
*
*
*
*
South Texas Project
Wasworth, TX
STPNOC
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
2003
*
*
*
*
*
*
Three Mile Island
Middletown, PA
G. P. U. Nuclear
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1989
*
*
*
*
*
*
1994
*
*
*
*
*
*
1999
*
*
*
*
*
*
2004
*
*
*
*
*
*
Trojan
Rainer, OR
Portland General Electric Co.
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1991
*
*
*
*
*
*
Tendon Removal & Replacement
Year
Unit
Description
1994
1
Complete detensioning of the containment, 70 vertical and 152 hoop tendons and removal of 16 horizontal and 8 vertical tendons to allow removal of steam generators.
1996
1
Removal of an additional 6 verticals and 5 horizontals for reactor removal.
Turkey Point Nuclear Power Plant
Florida City, FL
Florida Power & Light Co.
Year
Callibration
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
1987
*
*
1992
*
*
2001
*
*
*
*
*
*
2006
*
*
*
*
*
*
2007
*
*
*
*
*
*
Tendon Removal & Replacement
Year
Unit
Description
2004
3
Replacement of 50 horizontal and vertical tendons for replacement of steam generator through wall of containment. Subcontract to SGT Corp.
2004
4
Replacement of 50 horizontal and vertical tendons for replacement of steam generator through wall of containment. Subcontract to SGT Corp.
V. C. Summer Nuclear Station
Parr, SC
South Carolina Electric & Gas Co.
Year
In-Service Inspection
Material
Equipment
Quality Assurance
Engineering
Surveillance Report
Other
1987
Supplied spare parts including three 400' spare tendons.